Saturday, 22 November 2014
Shooting Day 1 - Review - Michael Hickey
Shooting Day 1 Review
I am very happy with our progress on our first day of shooting. I feel that we were all pretty consistent and on track throughout shooting.
We were all confident in our role and met the requirements for a successful shooting. Nathan Kearns was our camera operator, Connor Burgess was the Actor and I was the Director.
We all had constant input into what shots we should do and how we may be able to implement new shots. After following the story board and shooting script to see what shots we had to do we recorded a lot of extra footage to use when editing.
I feel that by having extra footage we are able to have a lot more diverse options when editing our final music video.
It was also very important for us to get to the location on time. We had to stick to our schedule to ensure our shooting wasn't interrupted. We got to the Albert Docks at 10:30 and finished around 11:30.
I am very pleased with our time management for our first day, i am also very happy that we got more footage than we should have to ensure minimal mistake when editing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment